Skip to content

Asphalt

Parking lot sealcoating in Chicago: when to sealcoat, and when to skip it

Sealcoating protects an asphalt parking lot from water, sun, and salt, and it makes a property look cared for. But it only helps pavement that is still sound, and only when it goes down at the right time and in the right conditions.

MBS Field Team

Published 4 min read

Freshly sealed and striped parking lot outside a large warehouse at dusk

Here is how to decide whether your lot needs sealcoating this season, and what should happen first.

Key takeaways

  • Sealcoat protects the surface of sound asphalt. It does not repair cracks, potholes, or a failed base.
  • Seal cracks and patch failed areas first, or the new coating will crack right along with them.
  • In Chicagoland, the sealcoating season runs roughly from late spring to early fall, in dry, warm weather.
  • New asphalt usually needs several months to cure before its first coat.
  • Most lots need a new coat every few years, not every year. Too many coats can build up and crack.

What sealcoating does, and what it doesn’t

Asphalt is held together by a binder that slowly dries out and oxidizes in sunlight. As it ages, the surface turns gray, loosens, and lets water in. Sealcoat is a thin protective layer applied over the top. It slows that aging, sheds water, resists gasoline and oil, and gives the lot a fresh, dark finish.

What it does not do is add strength. Sealcoat will not close a wide crack, fill a pothole, or fix pavement that is sinking because the base underneath has failed. Coating over those problems only hides them for a season. If your lot is showing structural damage, the money is better spent on repairs first. Our guide to pothole repair explains how to tell the difference.

Signs your lot is ready for sealcoating

A lot is a good candidate when the pavement is still sound but starting to show its age:

  • The surface has faded from black to gray.
  • Small stones are starting to show or loosen on the surface.
  • Water soaks in rather than beading and running off.
  • There are fine surface cracks, but no large failed areas.
  • Oil and fuel stains are softening the asphalt in parking stalls.

If the lot instead has alligator cracking (a web of connected cracks), potholes, or areas that flex or sink under traffic, those spots need repair before any coating goes down.

Fix cracks and failures first

Sealcoat is only as good as the surface under it. Before coating, a careful contractor will clean the pavement, treat oil spots, fill and seal cracks, and patch any failed sections. Crack sealing matters most: water that gets through a crack softens the base below, and in a Chicago winter it freezes, expands, and widens the crack further.

If a quote for sealcoating does not mention crack sealing or patching, ask why. Either the lot does not need it, or the scope is leaving out the part that protects your pavement the most.

Timing: Chicago’s sealcoating season

Sealcoat needs warmth and dry weather to cure. As a general rule, application happens when temperatures are around 50°F and rising, with no rain expected for at least a day afterward. The product manufacturer’s instructions set the exact limits, so ask your contractor which product they use and what conditions it requires.

In the Chicago area, that usually means a working season from late spring into early fall. Fall work is possible on mild days, but cool nights slow curing, so earlier is safer.

Brand new asphalt is a special case. Fresh pavement needs time for its oils to settle before it is sealed, typically several months. Your paving contractor can tell you when a new lot is ready for its first coat.

How often to recoat

More is not better. Most commercial lots need a new coat every few years, depending on traffic, sun exposure, and how well the previous coat has worn. Applying sealcoat too often builds up a thick layer that can crack and peel on its own.

A good rule is to recoat when the previous coat has worn through in the main drive lanes and the surface is starting to look gray again. A contractor can also apply heavier coverage in high-traffic lanes than in parking stalls.

Plan around traffic and tenants

A freshly sealed lot has to stay closed until the coating cures, usually most of a day in good weather. On a busy commercial property, that takes planning:

  • Sealcoat in sections so part of the lot stays open.
  • Schedule work around deliveries, trash pickup, and peak hours.
  • Give tenants notice, with the dates and which areas are affected.
  • Plan restriping right after sealcoating, since the new coat covers the old lines.

Restriping is also the moment to check your accessible parking layout. The ADA parking lot checklist covers what the spaces, aisles, and signs need.

Ask the right questions before you sign

When you compare sealcoating quotes, ask:

  • What surface preparation is included: cleaning, oil spot treatment, crack sealing, patching?
  • Which product will be used, and how many coats?
  • What weather conditions will the work wait for?
  • How will the lot be sectioned, and how long will each area be closed?
  • Is restriping included, and will the layout be checked?

Some communities restrict certain coal tar-based sealers, so it is also worth asking what the sealer is made of. Clear answers to these questions make it easier to compare bids on what they actually include, not just on price.

[ Next step ]

Make the next step straightforward

A walkthrough helps clarify what needs attention and how the work may fit around your property's operations. MBS Group provides commercial asphalt & pavement work across Chicagoland.

When requesting a quote, share the property address, the areas of concern, and any access or scheduling constraints. You can request a quote; we respond within 24 to 48 hours.

Written by the MBS Field Team

Our crews handle commercial masonry, concrete, asphalt, and drainage across Chicagoland. Learn more about MBS Group.

Keep reading

View all articles

Request a quote

Tell us about your property.

Send a few details and we'll get back to you within 24 to 48 hours. Prefer email? Write to Email us or call 866-4MBS-FIX.